FEATURED

Project



Wayne Gretzky Sports Centre exterior photo
Nelson Pool


After being deemed structurally unsafe and closing its doors in 2015, the City of Burlington began planning the transformation of the Nelson Pool.  Aqua Plans was hired to complete the full design of the new, revamped swimming pool. Nelson Pool reopened to the public in 2017 and features a 50M, 8-lane competition pool, along with a family friendly beach entry area, spray features, a full perimeter overflow recirculation system, climbing wall and dual diving boards.


MORE DETAILS